PRESIDENT MESSAGE
As President of our association, I am fully aware of the challenges our community continues to face.
Every day, my team and I push forward because we believe deeply in the potential of this community. But
potential alone is not enough — we need action.
This is the moment for every resident to step forward. Your involvement, whether through consistent monthly dues or volunteering when called
upon, is what strengthens our ability to solve problems, improve our surroundings, and build the safe, unified community we all want.
We need every member to embrace a renewed sense of pride, unity, and determination. When we move together with synergy, there is no challenge we cannot overcome.
Let us commit — each of us — to doing our part. The future of our community depends on it.
The President
BACK TO SCHOOL TREAT 2025
The Association held a back-to-school treat in August With sponsorship from BACCHUS Construction, GraceKennedy, 832 Party Rentals, Cash Biz Finance, and Kirk Mathews, Caretaker for St. Catherine south Central, more than 80 children benefited from this treat.
SECURITY SYSTEMS
“CCTV restored and placed under continuous maintenance.”
COMMUNITY TREAT JULY 2026
The Association held a fun day and World Cup watch party at the community
park in July 2026.
IMPROVEMENT OF MAIN ENTRANCE
Work was carried out to create a desert garden on both
sides of the entrance and to install a community name
sign with illuminated solar lights.
SECURITY FENCE
The Association installed security fencing at the entrance to our community, in the open space between our community and Jacaranda, along with a CCTV awareness sign.
STANHOPE PARK AND RECLAMATION
Work has commenced on this park in partnership with residents who live in its vicinity. The intent is to install children’s playsets, solar lights, an exercise trail, and other amenities.
This project is ongoing; therefore, future workdays will be announced.
MAILBOX AND SAFETY SIGNAGE
A mailbox was installed at the community’s main park to facilitate the receipt of Association mail. A safety sign was also installed to notify motorists that children play in the area
SOLAR LIGHTS INSTALLATION AT THE MAIN PARK
Two solar lights were installed at the community’s main park (the play area), with more to follow
Labour Day 2026
This labour day saw members of the community under the task of road patching using concrete by members of the community. The White-Water Boulevard was done under private contractual arrangement. It is acknowledged that there is still work be done and we remain committed to seeing our effort to its finality
BASSET PARK RECLAMATION AND UPKEEP
Extensive work was done at this park on Labour Day 2026 to remove dumped building materials and overgrown shrubbery.
This intervention also included the installation of solar lights and three seats (one of which was donated by a resident).
BACK TO SCHOOL TREAT 2026
The Association held another back-to-school treat in August 2026. With sponsorship from BACCHUS Construction, GraceKennedy, 832 Party Rentals, and Cash Biz Finance, a wide cross-section of children within the community benefited from this event.
UPKEEP
The Association continues to maintain our green spaces—Basset, Stanhope, and the Main Park—as well as the main roadway leading to our community, on a regular basis.
FUTURE PROJECTS
- Multi-Purpose Court
- More CCTV Coverage
- Security Gate
FINAL NOTE
There is no doubt that you expect great things for your community, but this cannot be achieved by a few alone.
We need your support. Every contribution directly supports:
- Cleaner spaces
- Safer play areas
- Better roads
- Stronger security
- Stronger Community